We're finally able to take a shower in our master bathroom. It's been a long time coming, but I think the final product was actually worth the wait. Our tilers did an amazing job and created a beautiful work of art out of what we had simply planned would be a square shower. The interior corners are all perfectly curved and the bench area is amazing. The major reason this piece of our project took so long was delays in delivery of the tile...which we ordered through Matt's office. If anyone needs a recommendation for tiling companies, we certainly would use these guys again.
Sunday, April 27, 2008
Wednesday, April 16, 2008
Prodema
A few nice, dry days here have allowed for some exterior work to be done. This is the prodema siding on the East side of the house. The garage has not yet been done, and rain is expected for the rest of the week, so we'll just keep our hopes low for completion. The master shower tile is about half done now - and wow! it's going to be bold. It will probably be all placed by tomorrow night and then will still need a day of grouting - hopefully Friday. Slowly, very slowly, we're nearing completion. We are feeling very at home here now...it is a wonderful space to call home. Both Matt and I have had nightmares about selling this house...needless to say, we are very happy to be in, and, at this time, NEVER want to leave this place!
Tuesday, April 1, 2008
Getting settled
The metal siding portion of the exterior of the house was completed last Friday. From this angle, it nearly looks finished! ...but the prodema (see link for info) portion of the siding still needs to be installed. That will be placed on the East side of the house (living room wall) and around the stairway windows.
The empty spot on the garage will also have prodema siding. We have a bit of landscaping yet to do! Matt is planning on screening in the porch this spring...and we'll need it; I spotted a mosquito last week - at 42 degrees!
The tile of the kitchen backsplash was installed last week... we're still waiting for our master shower tile to arrive. This tile is clear glass, but has a beautiful sea-green hue to it installed.
The custom cabinetry was installed in the living room last week, too. We are still waiting on the fireplace surround, which is currently being fabricated. (Note the mess already collected on the entryway ledge....)That's it for this week's update....more to come.
Wednesday, March 12, 2008
Getting there....
Dining room from kitchen
Kitchen from entrance
Living room from steps
Master bath
We're living in the house now! The exterior still has a ways to go, but inside we're feeling pretty comfortable...especially with the heated concrete floors. It's been too long since I've posted, but I don't have time to go into great detail. Pictures are worth a thousand words, right?
Wednesday, February 27, 2008
The Front Door
The tiling is mostly complete in the boys' bathroom and looks good. Unfortunately, the tile we ordered for our shower is backordered for a 2nd time - to the end of March. The plumber arrived yesterday and should get most of the plumbing done this week. Our countops are to be installed today. Trimwork continues...there is just so much of it to be done, but it's looking beautiful.
The roof has finally been started and yesterday we also saw a glimpse of the siding...we're anxious to see more of it, but the zinc color is going to look very nice with the timbers.
We're getting very tired of being completely unsettled. This is our 4th week of homelessness! The boys are handling it much better than I am...but we're hopeful that we only have one more week of this. Again, we're so grateful for all of our wonderful friends who have taken us in and offered to take us in, as well as to my parents, who have earned their grandparenting merit badges!
Friday, February 22, 2008
Photo Update
Alright, here are some photos, finally! Things are starting to come together....but there are plenty of things yet to do. Today they actually are starting to install the metal roof! (It's a balmy 25 degrees!)
This is the start of the custom cabinetry in the living room. This view is from the stairs looking toward the front door. A long bench made out of douglas fir will span the entire length.
This is the kitchen cabinetry last week. The island is now installed as well. Next week we hope for countertops and appliances. We also need to install the hardware....an ikea purchase.
The stonework has been completed inside and out. It looks wonderful! The fireplace surround will be metal plating (designed by my architect) and should be installed next week.
The window trim is looking good. This is the living room - East side wall.
The final trim on an upstairs bedroom window. Very clean and simple.
A tile-prepping master has been hard at work in our master shower all week. He's created an unbelievable space that was totally unexpected to us. We're anxious to see the tile start going in next week.
The cabinetry/lighting in our master bath. Again, the countertop should be placed next week, so that the sinks can be installed. The plumber arrives Tuesday to start hooking up appliances and fixtures.
Thursday, February 21, 2008
Slow Home
I just discovered this movement - the "Slow Home" - that epitimizes what we believe and are trying to accomplish. (and, unfortunately, is exactly the speed of our construction!) Check it out! http://theslowhome.com/blog/index/
Wednesday, February 20, 2008
Good Test
I forgot to mention in my previous post that we had a good test of the performance of our home Tuesday night. While working at the house that night, we noticed that the furnace/water heater was not working and determined that it was some sort of power failure, but no one could take a look at it until the next morning. When we left the house at 10 PM, the temperature was 67 degrees...upon arriving at 7:30 the next morning, after a night with absolutely no heat and sub-zero temperatures outside, the thermostat read 60 degrees. Pretty darn impressive, I think! (It was an electrical issue that was quickly resolved.) I can't wait to see how low we can keep our heating/cooling bills...score 1 for SIPs!
Deep breaths
As you may have noticed, I've taken a bit of a break from posting here. For the past 2 1/2 weeks we've been gypsies and life has been stressful, to say the least. But thanks to good friends and excellent parents/grandparents, we're making it through. I have found an apartment we can rent week to week for the next 2-3 weeks so that we can be living as a family again. (And possibly be able to post pictures - if we can get a wireless connection on our laptop.)
On the construction front, things are improving. All the drywall is painted, the kitchen cabinets are installed, we've assembled and installed our "custom closet" from ikea, the master shower is prepped for tile, doors are being stained and hung, window trim is stained and being installed, the interior stonework will be done today, custom cabinetry in the living room is being fabricated, and most of the lighting has been installed. Our hardwood flooring has been installed in the upstairs hallway and the stair landing...but still needs to be finished.
It's a busy place, but a lot still needs to happen. The counters in the kitchen and master bath were measured yesterday...and will take 1-2 weeks to complete. (They're just formica with wood trim) All of our exterior siding, roofing, and trim has arrived, but we need to wait for temperatures to rise above 0 degrees...maybe tomorrow...for that to get going. Our appliances are all here, but won't be installed until everything else is complete, and we're also waiting on the plumber to get the toilets and sinks hooked up. (He needs the countertops installed first, though.) The tile needs to be laid in the boys' bath, our master shower, and the kitchen backsplash, the stair treads haven't yet arrived (but the railing has and looks great!), and the carpet in the upstairs bedrooms will be the last thing to go in.
Phew - I'm exhausted just thinking about it all. Having a place to stay for the next few weeks does make it all seem much more tolerable, though... and, I just have to add a political note here - the results of WI elections yesterday gives me great hope - GO OBAMA!
On the construction front, things are improving. All the drywall is painted, the kitchen cabinets are installed, we've assembled and installed our "custom closet" from ikea, the master shower is prepped for tile, doors are being stained and hung, window trim is stained and being installed, the interior stonework will be done today, custom cabinetry in the living room is being fabricated, and most of the lighting has been installed. Our hardwood flooring has been installed in the upstairs hallway and the stair landing...but still needs to be finished.
It's a busy place, but a lot still needs to happen. The counters in the kitchen and master bath were measured yesterday...and will take 1-2 weeks to complete. (They're just formica with wood trim) All of our exterior siding, roofing, and trim has arrived, but we need to wait for temperatures to rise above 0 degrees...maybe tomorrow...for that to get going. Our appliances are all here, but won't be installed until everything else is complete, and we're also waiting on the plumber to get the toilets and sinks hooked up. (He needs the countertops installed first, though.) The tile needs to be laid in the boys' bath, our master shower, and the kitchen backsplash, the stair treads haven't yet arrived (but the railing has and looks great!), and the carpet in the upstairs bedrooms will be the last thing to go in.
Phew - I'm exhausted just thinking about it all. Having a place to stay for the next few weeks does make it all seem much more tolerable, though... and, I just have to add a political note here - the results of WI elections yesterday gives me great hope - GO OBAMA!